The Poole Bay Partnership

Poolebay.net was first published in response to the high level of public interest in the major beach replenishment projects of 2005-2007.

Copyright © 2005 - 2015 The Poole Bay Partnership. All Rights Reserved. Privacy Policy & Cookie Guidance. Web design.

Borough of Poole www.poole.gov.uk

Other sources of local coastal information

Standing Conference on Problems Associated with the Coastline Poole & Christchurch Bays Shoreline Management Plan (SMP)

These pages contain only archived material

Winter Trials of Sand Recycling on Poole's Beaches

During November 2013 a one-off coast protection trial was prepared at Poole to assess the volume of wind blown sand and the possibility of recycling sand on Poole's beaches.

Unfortunately the severe storms of December 2013 and January 2014 effectively put paid to the trial, removing significant quantities of sand from the system and bringing beach levels down to that of the metre deep trial hole dug out east of Flaghead Chine beach. The beach will be monitored and another trial may be arranged for a future date.

The Trial

A metre deep hole was dug in the sand east of Flaghead Chine beach, and it was anticipated that the naturally occurring build-up of ‘aeolian’ or wind-blown sand in this area would refill the hole over the winter months. Meanwhile, the sand taken from Flaghead Chine was recycled back on the beach at Shore Road.

The movement of sand, using dumper trucks, took place w/c 4th November.

Why is this work needed?

In Poole sand moves from west to east along the seafront. The aerial photo below shows, in red, where erosion is taking place between Shore Road and Flaghead Chine beach. If it is not addressed the erosion at Shore Road will continue to narrow the beach and erosion will eventually creep eastwards along the seafront.

What will the trial tell us?

This is a 'learn-by-doing' coast protection trial which will enable us to investigate whether the effects of erosion can be balanced by the movement of sand. It is hoped that the recycled sand deposited at Shore Road beach will, in time, return to Flaghead Chine.

A final survey will assess:

The results of the trial will inform the Beach Management Plan (to be completed by 2016) which will set out how the Council will manage the beach for coast protection purposes.

Erosion (shown in red) between Shore Road & Flaghead Chine beach; if not addressed erosion will continue to narrow the beach at Shore Road

Shore Road
Flaghead Chine
click to view a larger image

The area of Flaghead Chine where wind-blown sand builds up. This site is where we dug the hole; it was hoped the hole would re-fill over the winter months

Note: in the image above, the darker the red the greater the erosion. Blue represents areas of accretion (the accumulation of sand) recorded between 2007 and the present day; the darker the blue the greater the levels of accretion.

The Works

Click to view larger image

Sand moving plant 05/11/13

Borough of Poole www.poole.gov.uk